At Queens Hill Primary School we manufactured, supplied and installed a two tier reception desk with a ribbed design. It creates a bold and exciting first impression of the school. The desk was made in a two tier design to accommodate for DDA regulations. It was manufactured on a Oak laminate with a PVC edging on the top with a brushed stainless steel plinth at the base. We included areas for cable management and made storage units and located them on the underside.